The scheme uses a combination of natural materials to create a contemporary design which complements the historic listed building.   Modern methods of construction will be used where possible including driven piles, pre-fabricated load-bearing timber frames and pre-fabricated shower pods  to reduce the impact on the existing ecology on the sensitive site and speed up construction. 
 
BAM Design’s recent commissions include 
Somerstown Hub, now Somerstown Central in Portsmouth, and 
Nishkam High School in Birmingham.