Grutness Pier, Shetland Islands

A solid foundation for new harbour infrastructure

The ferry between Grutness on the Shetland mainland and Fair Isle – 25 miles to the south – is a vital lifeline to the UK’s most remote inhabited island.

In a major investment by the Shetland Islands Council and the UK government, the Fair Isle ferry is being replaced to help secure the 60-strong community’s long-term future by improving transport links to and from the island.

The ferry carries food, fuel and medical supplies, as well as bringing tourists to the island and enabling children to travel to and from school.

A newly commissioned, larger vessel will replace the 30-year-old Good Shepherd IV. But the modern, roll-on-roll-off design requires improved infrastructure to operate, both at Fair Isle harbour and at the Grutness terminal on the main island of Shetland.

As prime contractor, BAM is delivering the essential infrastructure improvements to support this initiative.

At Grutness, a more sheltered berth is being created and the pier is being extended based on a new and robust tubular piling scheme. This key element of the project was a real challenge in this remote and weather-beaten marine location. The finished works showcase BAM’s expertise in complex and demanding ground engineering environments.

Icon measurement
610 mm

Diameter tubular piles

Icon money
£ 45 + million

Upgrade programme to Grutness Pier and Fair Isle harbour

Icon tonnes
2 tonne

Down-the-hole hammer system

The challenge: delivering major works in inhospitable conditions

Upgrading the pier at Grutness harbour – on the southern tip of the main island of Shetland – involved designing robust tubular piling structures to withstand salt corrosion, fierce storms and the constant battering of waves.

Installing the piling was also a significant challenge, in this remote location. Road access is via the A970, but this rural route includes single track sections. Near the port area, there is very limited space for turning and parking heavy vehicles.

The surrounding landscape is an extremely complex series of deeply indented bays, cliffs, beaches and settlements. Locally, the ground conditions – including extremely strong rock armour, collapsing sand and gravels and strong sandstone bedrock – as well as the sea currents in the harbour presented their own challenges. 

So the essential piling work needed to be completed as quickly as possible, minimising disruption to road traffic and local residents.

It was also important to align completion of the whole programme of work with delivery of the new ferry, so that it can be brought into operation as quickly as possible. 

The BAM solution: pragmatic and innovative techniques

BAM combined a conventional rotary piling rig with a purpose-designed conversion kit to allow down-the-hole (DTH) hammer drilling techniques needed to anchor the piles into the sandstone bedrock.

The piling rig and crane were delivered by barge from Lerwick harbour. Drilling was caried out off a jack-up barge, as well as the existing pier, using a bespoke piling gate designed by BAM specifically for the project.

In total, 105 interlocking tubular piles and 31 single piles where needed to support the new pier structures.

The single piles for the covered side of the pier extend out into the sea, so the site team needed to ensure that the strong currents didn’t move the piles outside the allowed positioning tolerance while they were being set-up. The methodology they developed involved securing the piles by welding a spare section of clutch onto each pile attaching a corresponding frame with clutch onto the piling gate to hold the pile in position.

A number of complex lifts were involved, especially when working on the barge. Piles were craned from the edge of the pier into the bespoke pile holding frame. In the tighter spots, the mast of the rig and the crane boom were less than two metres from each other, so great care and precision was needed.

The drilling method used air flush and DTH hammer techniques to drive 610mm diameter piles to the required depths, including a rock socket at least two metres deep.
The team also used a temporary stand to hold the hammer and a clamp to suspend the pile above the seabed while the pilot bit was engaged.

The project also involved close collaboration with local suppliers in Shetland, whose knowledge and experience of the marine industry on the island proved invaluable.

The result: smart thinking delivers geotechnical excellence

The innovative tubular piling design developed by BAM’s ground engineering experts – along with the choice of drilling systems and equipment – not only overcame the significant geotechnical challenges of the site but also meant that the piles could be installed quickly.

The methodology developed to hold the piles in position during set-up demonstrated smart thinking from the site team: making the best of the limited resources available on site. The choice of plant and technique also meant that BAM could drive the piles into the ground with a single pass. 

The project is great example of geotechnical engineering excellence through innovative design, technical adaptability and collaborative delivery in one of the UK’s harshest marine environments.

Ultimately, it will help improve the reliability of the ferry connection and secure the future of Fair Isle as a habitable island.

“The ferry is a lifeline for so many aspects of life in Fair Isle and its replacement will serve the island for many years to come.” 

Emma Macdonald Leader, Shetland Islands Council