Bingally substation link, Scotland
A holistic, low-impact ground investigation across a wild landscape
Hydro-electric is at the heart of the UK’s energy transition and the drive towards net zero, especially in Scotland. SSEN Transmission is investing heavily in infrastructure to transport that energy to where it’s needed, across the country.
The Fasnakyle Power Station has already been generating renewable energy in the Highlands for over seven decades. BAM’s expert ground investigation teams helped to de-risk the construction of a new 132 kV connection between Fasnaklye and the new substation being built at Bingally, across a remote peatland corridor, by delivering the right data in the right places.
Against a backdrop of heightened local scrutiny around energy transmission works, the ground investigation project provided a robust, defensible ground model that reduces unexpected ground risks during construction.
This has enabled SSEN Transmission to take better decisions around foundations, access, drainage and cable performance.
Project details
- Client
Scottish & Southern Electricity Networks (SSEN) Transmission - Principal contractor
BAM Siemens JV - Ground engineering prime contractor
BAM - Designer and investigation supervisor
Fairhurst/SLR/ MGroup - Project value
£1.3 million
provided to designers throughout the project
variable head tests with data loggers to address groundwater concerns
dynamic sampling and rotary boreholes
incidents, near misses or environmental events
The challenge: understanding uncharted territory
Across Scotland, significant investments in network infrastructure are essential to connect renewable power sources and transport energy from where it’s generated to areas of demand across the country.
The new 400 kV Bingally substation is a key element of SSE’s planned improvements to the Beauly to Denny overhead line in the Highlands. It will connect to the Fasnakyle hydro station via a new 132 kV connection that includes around seven kilometres of underground cabling, as well as an 800m section of overhead line.
The link crosses ecologically sensitive habitats, including many peat bogs and water courses, trees with potential bat roosting sites and bird nesting areas. The landscape is also home to protected mammals, reptiles and amphibians.
So the design of the cable routes, joint bays, access routes, drainage, earthworks and foundations for the towers supporting the overhead lines must be informed by detailed and accurate data around ground conditions.
Even planning and carrying out the initial ground investigation itself was a challenge, given the conditions on this remote, upland site with limited infrastructure and long logistics chains.
The BAM solution: targeting key parameters
To protect vulnerable landscape and wildlife, the BAM ground engineering team used low ground pressure plant, matting and tight buffer distances (under 10m) to complete the ground investigation. Intrusive ground activities were rigorously controlled to minimise impact while maintaining safety and quality.
Thanks to early mapping work, desk research and site walkovers, BAM clearly identified where the ground conditions could be soft, wet and peaty.
The project followed on from a £2.7 million ground investigation – completed the previous year – for the 9.5km linear access road that extends from the Bingally 400kV Substation to the A831, as well as for the overhead line tie-in.
All the work was specified and carried out to the UK standard specification for ground investigation (ICE, 2022) and aligned with CDM 2015, following a robust pre-construction programme.
BAM took full responsibility for planning, execution and safety in this remote and difficult terrain, making sure that the investigation would minimise risk from unexpected ground conditions during the construction phase by targeting the most critical parameters to the build.
BAM drilled 14 rotary boreholes up to 30 metres below ground level, with standard penetration tests and monitoring installations, including groundwater and gas standpipes for ongoing monitoring. Along the whole corridor, the team created over 120 trial pits between 3 and 4.5 metres deep.
On the proposed access roads, dynamic cone penetrometer (DCP) testing was used as a fast and portable way to measure soil strength and compaction. BAM also carried out tests to assess thermal resistivity along the underground section of the route, so that earthworks and pavement structures could be designed to the most appropriate dimensions and specifications.
Throughout the four-month project, BAM held weekly reviews with the client, with integrated input from the design, delivery and licensed ecology teams. Data was provided live to the design teams, allowing them to make decisions without waiting.
The team also had to constantly adapt to the changeable Scottish weather in late autumn/early winter, especially when it came to sequencing activities.
The result: minimising risk and environmental impact
BAM delivered the data from its ground investigations in standard AGS format, for seamless design integration. So the design team had access to high-quality, traceable data to make decisions that they could justify and defend.
Sustainability and protecting the environment were fundamental throughout BAM’s ground investigation. For example, during refuelling and other intrusive works, plant was kept at least 10 metres from streams or burns to avoid disturbing habitats and stop ruts being created or fine particles of soil polluting or blocking water courses.
Working in the boggy, peat-rich conditions meant that health and safety was vital, with enhanced supervision, exclusion and lifting plans. An adaptive approach to traffic management also helped to maintain safe platforms and prevent heavy plant from getting bogged down.
BAM’s integrated approach and targeted testing strategy minimised over-specification at the design stage, as well as the risk of the construction team coming across unexpected ground conditions.
Against a backdrop of heightened public scrutiny, BAM’s evidence-led approach – focused on innovation and delivering value in an area where sustainability is paramount – produced a robust ground model that materially reduces risk and helps minimise the environmental impact of construction.
The project was shortlisted for the Ground Investigation Project of the Year at the 2026 Ground Engineering Awards.